Expose the damage
Remove failed material carefully enough to see what must be rebuilt.
Completed residential project · Covington, LA
The project began with damaged top-cap material, waterline and structural repair needs, leak concerns, and an interior that needed a complete restoration—not a cosmetic cover-up.

Completed scope
The work addressed edge and coping damage, skimmer and leak concerns, waterline tile, a structural corner, waterproofing, and the interior finish. Full replacement of every edge component is not claimed; the website describes only the documented work performed.


Why this project matters
Structural repair and waterproofing came before finish work. Tile alignment and grout followed the repaired substrate. Surface prep came before the new interior. Startup and inspection came last.
Remove failed material carefully enough to see what must be rebuilt.
Repair the substrate, reinforce the corner, and protect repaired areas.
Fit coping and waterline tile to the repaired edge and reinforce grout.
Prepare and resurface the interior, fill, start the system, and inspect.